Everything You Need to Know

Get clear, concise answers to common questions about our flooring solutions, process, pricing, and maintenance. If you don’t see what you’re looking for, feel free to reach out!

Installation Process

The installation will take anywhere from 1 to 4 days, depending on the specifics of your job.
We diamond grind every floor, whether new or old. We never use a power washer in your garage, as it could damage garage cabinets, baseboards, and walls. The diamond grinding machine is attached to a vacuum that collects 99% of the dust. Proper prep is the most critical part of the entire process.

Yes, whether the floor is new or old, it still needs to be diamond ground to open up the pores, allowing the epoxy primer to bond with the concrete.

Yes, we use state-of-the-art diamond grinding equipment with specialized vacuums that contain 99% of the dust. This process removes the old coating, leaving the floor ready for the new coating.

Post-Installation Care

After installation is complete, avoid placing foreign objects on the coated floor for 2 days to prevent foot traffic.
No vehicle traffic for 5 days. If polyaspartic/polyurea fast cure is applied at 77 degrees or higher, avoid foot traffic, vehicles, or foreign objects for 24 hours. If the temperature is below 77 degrees, wait 48 hours.
All epoxies will fade and turn yellow over time, which is why we use epoxy only as a primer or build coat. We use only aliphatic polyurethane with UVR (pigmented or clear) or polyaspartic/polyurea with UVR as a topcoat to prevent fading or yellowing.

Sweep or blow out dust and loose debris. Wipe up oil or grease spots with a paper towel. Use orange cleaner or a non-filming detergent as directed on the container. Use a mop with a wringer mechanism to mop the floor. Rinse the floor thoroughly. For tough stains or spot cleaning, use a mild degreaser such as paint thinner or mineral spirits. Avoid abrasive cleaners that may dull the surface.

Materials and Technology

Over the years, we have seen many DIY floors fail and not last. Removing those old coatings incurs extra charges. Your new floor is only as good as the preparation and products used.
We use industrial-grade epoxy primers, polyaspartic/polyurea topcoats, and aliphatic polyurethane with UV resistance. These professional-grade materials provide superior durability, chemical resistance, and longevity compared to retail products.
Epoxy provides excellent adhesion and build thickness but can yellow over time when exposed to UV light. Poly-based coatings cure faster, have better UV resistance, and offer superior chemical and abrasion resistance. We typically use epoxy as a primer/base coat and a poly-based coat as a topcoat for the best performance.
Our standard coating systems range from 20-30 mils in thickness (about the thickness of a credit card). This multi-layer approach provides optimal durability while maintaining a beautiful finish.

Payment & Warranty

AZ Garage Floors offers a limited lifetime warranty on residential flooring against surface delamination for as long as you own your home, with 100% satisfaction guaranteed. We offer a 2-year warranty on all commercial applications and a 2-year warranty on pavers.
We accept cash, checks, and all major credit cards.
Yes, we typically require a 50% deposit to secure your installation date, with the remaining balance due upon completion of the project.
Our warranty covers delamination (peeling) of the coating from the concrete substrate under normal use conditions. It does not cover damage from impacts, chemical spills not promptly cleaned, or substrate failure such as concrete cracking or moisture issues.

Pavers and Additional Services

Yes, we offer paver sealing services with a 2-year warranty. Please contact us for more details about our paver services.
Our paver sealing process includes thorough cleaning, removal of weeds and debris, and application of a high-quality sealer that enhances color and provides protection against stains, UV damage, and erosion.
Our paver sealing typically lasts 2-3 years depending on exposure to elements and traffic. We recommend resealing every 2 years to maintain optimal protection and appearance.
Yes, we offer concrete crack repair, patching, and leveling services before coating installation. This ensures a smooth, durable foundation for your new floor coating.

Absolutely! We can incorporate custom colors, patterns, metallic effects, and even company logos or personal designs into your floor coating. Our design consultants can help you create a unique look that matches your style.